Back to All Downloads
📑 Official Technical Guidelines

Nepal Government Rate Analysis Norms

Download authorized rate analysis norms and standard technical specifications from DUDBC, Department of Roads (DoR), DoWRI, and DWSSM for preparation of construction estimates, tenders, and municipal approvals.

💡

Need Current Year District Rates?

Combine these norms with approved 77 District Jilla Dar Rates to calculate official unit costs per item.

View 77 District Rates →
DUDBC
8.4 MBPDF

DUDBC Standard Rate Analysis Norms for Building Works

Standard labor, material coefficients, and machinery outputs for earthwork, masonry, RCC works, plastering, painting, and roofing per DUDBC guidelines.

Latest Revision📥Download Now
DoR
12.1 MBPDF

Department of Roads (DoR) Standard Norms for Road & Bridge Works

Complete technical coefficients for sub-base, base course, asphalt/premix carpeting, heavy earth-moving equipment outputs, and bridge substructure/superstructure.

Approved Norms📥Download Now
DUDBC
4.7 MBPDF

DUDBC Sanitary, Plumbing & Electrical Rate Analysis Norms

Standard analysis norms for internal and external water supply lines, sanitary fittings, CPVC/PPR pipes, electrical wiring, distribution boards, and fixtures.

Updated Edition📥Download Now
General
1.2 MBXLSX

Automated Rate Analysis Excel Template (DUDBC / DoR Format)

Pre-formatted Excel spreadsheet with automated formulas. Enter 77 district material/labor rates to automatically compute unit rates with 15% contractor profit and VAT.

Excel (.xlsx)📥Download Now
DoWRI
6.2 MBPDF

Department of Water Resources & Irrigation (DoWRI) Norms

Norms for canal excavation, embankment compaction, gabion crate wire weaving, boulder packing, and river training structures.

Official Release📥Download Now
DWSSM
5.5 MBPDF

DWSSM Water Supply & Sewerage Construction Norms

Norms for trench excavation, pipeline jointing (HDPE/GI/DI), RCC reservoirs (OHT/Cisterns), and deep tube well drilling operations.

Standard Edition📥Download Now

⚙️ Standard Government Rate Analysis Breakdown in Nepal

1. Direct Cost (प्रत्यक्ष लागत)

Material Cost (per norm) + Skilled/Unskilled Labor Wages + Plant, Equipment, and Fuel hiring charges.

2. Contractor's Overhead & Profit

15% Overhead and Profit (OHP) is officially added directly to the total sum of Material + Labor + Equipment costs.

3. Government VAT (१३% भ्याट)

13% Value Added Tax (VAT) is calculated at the Bill of Quantities (BoQ) summary level per Nepali procurement norms.